Source: Stock image generated with AI.

Key Highlights

  • Total Metals completed four diamond drill holes totalling 1,718.5 metres at High Lake.
  • The infill drilling targeted the Purdex Zone trend where earlier holes returned mixed gold grades.
  • Core logging and sampling are underway, with assay results expected after quality checks.
  • The program ended when an exploration permit expired; new permit applications are under review.

Total Metals Corp. (TSXV: TT) completed its 2026 diamond drilling program at the Purdex Zone on its 100%-owned High Lake Gold Property in Northwestern Ontario, near the Ontario-Manitoba border. The company reported drilling four holes totalling 1,718.5 metres, aimed at infill testing a section of the Purdex Zone where previous drilling returned both high-grade and lower-grade gold intercepts.

The holes, HL-26-082 through HL-26-085, were drilled as fanned holes from a single permitted surface drill pad, which the company said was intended to minimize surface disturbance. Individual hole lengths ranged from 416.5 metres to 456.0 metres.

This article is a journalistic opinion piece which has been written based on independent research. It is intended to inform investors and should not be taken as a recommendation or financial advice.

Total Metals said drill-side quick logs indicate all four holes intersected the targeted structures, with significant quartz veining and local sulphide mineralization noted. Detailed geological logging, core cutting and sampling are in progress, and the company said it plans to report assay results after laboratory analysis and quality assurance/quality control verification.

Executive Chairman Michael Dehn said the infill drilling is intended to provide structural and lithological information to refine the company’s three-dimensional mineralization model and evaluate short-range grade continuity.

Permitting and next steps

Total Metals said the drilling program ended when its current advanced exploration drilling permit reached its expiry date, which limited the number of metres completed. The company said it has submitted new permits that are in the review and approval process with the Ontario Ministry of Mines and Energy.

The company’s near-term work plan for High Lake includes completing logging and sample dispatch for gold fire assay and multi-element geochemical analysis, integrating results into the Purdex Zone model, and ranking targets across the property to develop a 2027 exploration plan.

Total Metals also cautioned that while it has reviewed historical records referenced in the release and believes they reasonably substantiate the information presented, it cannot directly verify the accuracy of all historical data from previous operators, including sampling and analytical procedures.

Read the original press release on Stockhouse.com.

More From The Market Online

E3 Lithium starts Phase 3 at Clearwater demonstration facility

E3 Lithium has begun Phase 3 at its Clearwater demonstration facility in Alberta and says its Central Process Facility permit has moved to a…

Guardian Metal Resources sets annual meeting for 16 December

Guardian Metal Resources set its annual shareholder meeting for 16 December 2026 in London and said the notice and proxy were mailed.

New to The Street to air sponsored AI-focused show on Bloomberg

New to The Street said its sponsored Show #781 will air on Bloomberg TV, featuring Roadzen, Robo.ai, PureCipher and American Fusion interviews.

Barrick warns on mini-tender offer at US$26.40 per share

Barrick Mining said it received an unsolicited mini-tender offer for up to 50,000 shares at US$26.40 per share, below market.