PriceSensitive

E3 Lithium details Clearwater Project pre-feasibility study

Market News, Mining
TSXV:ETL
26 June 2024 14:30 (EDT)
E3 Lithium facility

(Source: E3 Lithium)

E3 Lithium (TSXV:ETL) has revealed results from a pre-feasibility study (PFS) of its Clearwater Project in south-central Alberta.

The company stated in a news release that the study outlines the project’s economic viability, environmental sustainability and long-term operational potential.

Additionally, the project reports Canada’s first lihtium-in-brine proven mineral reserve.

“The Clearwater Project PFS outlines, for the first time, the viability of lithium from the brines in Alberta,” Chris Doornbos, CEO of E3 Lithium, said in a press release. “This report signifies a fundamental shift for E3 Lithium, setting us on a clear pathway to commercial development and positions the Clearwater Project and Bashaw District as a strategic lithium asset in Canada and North America.”

Highlights of the study include:

The project also boasts initial operating costs of $6,200 per ton of LHM that will provide for a long life and robust project fundamentals as well as sustainably produced lithium. The PFS indicates that process water for the operation will be sourced from recycling and make-up water from waste brine stream.

E3 Lithium is focused on the commercial development of lithium extraction from brines contained in its mineral properties in Alberta.

Shares of E3 Lithium Ltd. (TSXV:ETL) are down 1.36 per cent to C$1.45 as of 12:37 am ET.

Join the discussion: Find out what everybody’s saying about this stock on the E3 Lithium Ltd. Bullboard investor discussion forum, and check out the rest of Stockhouse’s stock forums and message boards.

The material provided in this article is for information only and should not be treated as investment advice. For full disclaimer information, please click here.


Related News