PriceSensitive

Mineworx (TSXV:MWX) pilot plant optimization underway

Mining
TSXV:MWX
03 May 2022 08:45 (EDT)
Mineworx - CEO, Greg Pendura.

Source: Mineworx.

Mineworx (MWX) has commenced optimization work at its catalytic converter pilot plant located in Johnson City, Tennessee.

The company has completed all initial system checks and procedures. Water testing protocols through the entire system have been completed while checking for system leaks and areas of weakness in the pipes and fittings.

All new components are performing as per specifications and all safety and operational protocols are in place.

Different types, quantities and grades of catalytic converter feedstock materials, as well as the blending of these materials, will be processed over ongoing trial periods. The objective is to accumulate real-time data from smaller to incrementally larger scale continuous production runs. 

Mineworx develops and commercializes environmentally friendly processing technologies for the recovery of precious metals such as platinum and palladium.

Mineworx Technologies (MWX) opened trading at C$0.08 per share.

Related News