PriceSensitive

Trillion Energy (CSE:TCF) announces drilling start date

Energy, Sponsored, The Watchlist
CSE:TCF
23 August 2022 13:45 (EDT)

This browser does not support the video element.

Trillion Energy (TCF) has announced that the Uranus drilling rig is expected to arrive at the SASB natural gas field on August 29th.

CEO Arthur Halleran sat down with Daniella Atkinson to discuss the news.

“We are pleased to announce a clear path to drilling and gas production. We are counting the days before we embark on this historical achievement to bring substantial new gas production into the region at a critical time”.

The rig is currently undergoing an inspection, survey and permitting process. The process is going as planned, with no major issues identified to date. Final inspection and acceptance are anticipated on or about August 26th, then the rig will be hauled by marine ships to the SASB Gas field.

When the rig arrives, it will be positioned at the Akcakoca offshore production platform. Positioning and jack up of the rig should take a day, weather permitting. Other preparations will take 2 more days before the first well is spud on or about September 1 this year.

Trillion Energy is an oil and gas producer with assets in Turkey and Bulgaria. The company’s Turkish assets include interests in the SASB natural gas field and the Cendere oil field. In Bulgaria, the company holds a prospective unconventional natural gas property, the Vranino 1-11.

Trillion Energy International Inc. (TCF) opened trading at C$0.39.


Related News