Satori Resources - CEO, Jennifer Boyle.
CEO, Jennifer Boyle.
Source: Satori Resources.
  • Satori Resources (BUD) has received an exploration permit for its Tartan Lake Project in Manitoba
  • The permit on its 100-percent-owned property, is valid for three years.
  • It allows for 155,000 metres of drilling
  • The Toronto-based mineral resource exploration company plans to resume drilling in the current quarter, with a 5,000-metre phase II drill program
  • The drill program will include a series of deep holes testing the extent of recently-announced high grade mineralization
  • Satori Resources is unchanged, trading at $0.14 at 10:04 a.m. EST

Satori Resources (BUD) has received an exploration permit for its Tartan Lake Project in Manitoba.

The permit on its 100-percent-owned property, is valid for three years.

It allows for 155,000 metres of drilling.

The Toronto-based mineral resource exploration company plans to resume drilling in the current quarter, with a 5,000-metre phase II drill program.

The upcoming drill program will include a series of deep holes testing the extent of recently-announced high grade mineralization, which intersected an average 47.56 grams per tonne of gold over 5.8 metres, within a wider interval averaging 23.76 grams per tonne over 12.6 metres.

This is the second highest value intercept ever recorded at Tartan Lake with over 500 holes completed to date, and was one of the top five high grade drill intercepts reported last year.

The company also plans continue to expand the South Zone to depth, and to begin drill testing targets along the property’s wide shear zone, outside of the current resource areas.

“We are looking forward to following up on the spectacular high grade results reported in TLMZ21-12. Our phase one drill program at the Main and South Zones delivered on every one of our stated objectives. We demonstrated continuity of the mineralized system at depth, down plunge, and we are thrilled that of the twelve holes drilled, two reported intersections which ranked as the second highest results ever at both the Main and South Zone deposits. We have a strong balance sheet going into 2022 and the phase 2 drilling in Q1 is intended to expand the high-grade Hanging Wall Zone intersected in TLMZ21-12,” said Satori President and CEO Jennifer Boyle.

The 2,670-hectare Tartan Lake Project includes the past-producing Tartan Lake Mine and is located in the Flin Flon Greenstone Belt, Manitoba.

Satori Resources is unchanged, trading at $0.14 at 10:04 a.m. EST.

More From The Market Online

Now trading on the TSX Venture Exchange: Kootenay Resources Inc.

Shares in Kootenay Resources Inc. (TSXV:KTRI) begin trading on the TSX Venture Exchange after final approval.

A promising player in the energy revolution

As demand for sustainable energy sources has intensified, Argentina Lithium & Energy is ready to capitalize on the surging lithium market.

Buzz on the Bullboards: The top stocks in energy, mining and EVs

While energy gains propel the TSX, industrials get attention from the EV market and investors navigate another week of mining sector activity.
Laurion Mineral Exploration Ishkõday gold project

Top-performing mining stock adds three new gold zones

Laurion Mineral Exploration (TSXV:LME), a top-performing junior gold stock, shares assay results from its 2024 drilling program in Ontario.