Source: Stock image generated with AI.

Key Highlights

  • HPQ Silicon unveiled a portable power system designed to run the Starlink Mini terminal off-grid.
  • The HPQ ENDURA+ MiniMax is rated at 1.95 kilowatt-hours and uses 84 Gen4 lithium-ion cells.
  • HPQ plans to open deposit-based reservations in January 2027, with deliveries targeted for early Q2 2027.

HPQ Silicon Inc. (TSXV: HPQ) has introduced the HPQ ENDURA+ MiniMax, a 1.95 kilowatt-hour portable energy system intended to power the Starlink Mini satellite internet terminal away from the electrical grid. The company described the product as a new commercial application for its Gen4 lithium-ion battery cells, which it developed with French partner Novacium SAS.

HPQ said the Starlink Mini terminal is designed for use in remote locations but does not include an integrated battery, requiring an external power source. The company positioned the MiniMax as a dedicated solution for that use case, citing Starlink Mini’s average power consumption of 25 to 40 watts and estimating the MiniMax could provide up to 80 hours of operating autonomy.

This article is a journalistic opinion piece which has been written based on independent research. It is intended to inform investors and should not be taken as a recommendation or financial advice.

According to HPQ, the MiniMax incorporates 84 HPQ ENDURA+ Gen4 lithium-ion cells rated at 6,500 mAh (23.4 Wh) each, assembled into an integrated battery pack with a dedicated power output. The system is packaged in a rugged case that also provides space to store and transport the Starlink Mini terminal, and HPQ said the complete system weighs about 12 kg.

HPQ said the product is a third-party power solution designed to be compatible with Starlink Mini and is not affiliated with or endorsed by SpaceX.

Novacium R&D Director Dr. Oleksiy Nichiporuk said, “We designed the system to power the Starlink Mini terminal off-grid, with a dedicated output and a rugged case that protects the antenna during transport.”

HPQ said certification for the HPQ ENDURA+ MiniMax is in progress. The company plans to open reservations with deposits in early January 2027 and is targeting initial commercial deliveries between the end of the first quarter and the beginning of the second quarter of 2027, noting the timing is subject to execution and market conditions.

In the release, HPQ also said it holds a 36.8% equity interest in Novacium and has exclusive rights to commercialize Gen3 and Gen4 cells and related battery packs in Canada, the United States and Mexico.

Read the original press release on Stockhouse.com.

More From The Market Online

Microsoft launches AI Transparency Initiative with 40+ organisations

Microsoft launched its AI Transparency Initiative with 40+ organisations, aiming for open standards and integration into Copilot and other products.

Bombardier opens aircraft service centre in Fort Wayne

Bombardier opened a 64,500-square-foot aircraft service centre in Fort Wayne, Indiana, expanding its U.S. maintenance and support network.
Legend of Zelda Grand Theft Auto

Bigger than Barbenheimer: The Legend of Zelda vs Grand Theft Auto VI

Grand Theft Auto VI and The Legend of Zelda: Ocarina of Time created a gaming version of the "Barbenheimer" phenomenon, but bigger.
Anthropic Nears IPO Pricing as AI Stocks Stay Pressured

Market Open: Anthropic Nears IPO Pricing as AI Stocks Stay Under Pressure | Nov 17th

Anthropic’s IPO demand hit six times supply, Quebecor pursued Telus in a $31 billion bid, and AI stocks weighed on the Nasdaq.